Under Construction – Plant Construction Company, L.P. https://www.plantconstruction.com Sat, 22 Sep 2018 00:13:01 +0000 en-US hourly 1 https://wordpress.org/?v=4.9.8 447 Minna Street https://www.plantconstruction.com/projects/447-minna-street/ Thu, 04 Jan 2018 21:15:25 +0000 http://www.plantconstruction.com/?post_type=projects&p=1735 Plant removed and replaced the wood framed roof of a 100 year old, four-story brick and heavy timber building owned by the Hearst Corporation. The project includes upgrading the diaphragm with shear ply, new membrane roofing system, rebuilding and restoring the masonry walls, new elevator system, and interior demolition and shoring.

]]>
Pier 70 – Phase I Horizontal and Public Realm https://www.plantconstruction.com/projects/pier-70-phase-i-horizontal-and-public-realm/ Thu, 04 Jan 2018 19:22:59 +0000 http://www.plantconstruction.com/?post_type=projects&p=1728 The work for Pier 70 Horizontal Improvements Phase I includes: excavation and grading; utility work; streets and sidewalks; three large parks; and the shoreline work for this roughly 35 acre site. The site is the historic Bethlehem Steel shipyard and is located on the Southeastern waterfront of the City, just below Mission Bay and encompasses most of the land east of Illinois street to the Bay’s edge, between 20th and 22nd streets. Over the three phases of work, we will be creating the building pads for seventeen new buildings, both office and residential. The preconstruction effort will begin immediately and the construction is slated to begin in Summer of 2018.

]]>
Meals on Wheels of SF https://www.plantconstruction.com/projects/meals-on-wheels-of-sf/ Thu, 04 Jan 2018 16:44:08 +0000 http://www.plantconstruction.com/?post_type=projects&p=1726 Plant is about to begin preconstruction on a new facility for Meals on Wheels of SF. Meals on Wheels, now delivering over 1.6 million meals per year, has outgrown their existing facility on Fairfax Avenue, a few blocks from Plant HQ, and has purchased a piece of property on Jerrold Street, also just a few blocks away. The new 60,000 square foot facility on 2 levels, will contain a new commercial high production kitchen, cold storage, warehouse, loading dock, logistics and office space. Challenges on the project will be the bay mud soil underlying the site, establishing workable easements with neighbors and the construction of the complicated and extensive kitchen. Upon completion of the new building, we will begin the renovation of the 20,000 square foot existing facility on Fairfax ave, which will include interiors work, new elevators and stairways and other improvements. The new building is expected to be a 13 month project, with the existing building being completed 7 months later. Meals on Wheels is an amazing organization, providing a much needed service to our community, and we are excited to be associated with such a good cause.

]]>
2150 Webster Street https://www.plantconstruction.com/projects/2150-webster-street/ Thu, 04 Jan 2018 00:34:20 +0000 http://www.plantconstruction.com/?post_type=projects&p=1723 Core and shell improvements to an existing 10-story, 250,000 sf office building in Oakland. The project includes new windows, renovated storefront, five new elevators, new penthouse structure, roofing, fire sprinkler system upgrades, plumbing and HVAC systems, new electrical wiring and a new steel deck.

]]>
UCSF Clinical Science Building + UC Hall Seismic Renovation Program https://www.plantconstruction.com/projects/ucsf-clinical-science-building-uc-hall-seismic-renovation-program/ Tue, 26 Dec 2017 23:55:50 +0000 http://www.plantconstruction.com/?post_type=projects&p=1688 Seismic retrofit and renovation of historic 109,000 sf Clinical Sciences Building for future classroom, meeting and academic work space uses. The scope includes demolition and abatement; seismic upgrade renovations; historic restoration; new construction for new entry way; interior construction including, MEP, data and telecommunications cabling; and building site landscape. The scope will also include assignment of FF&E (Furniture, Fixtures, and Equipment) and elevator contracts.

]]>
Presidio Hotel https://www.plantconstruction.com/projects/presidio-hotel/ Tue, 26 Dec 2017 23:50:26 +0000 http://www.plantconstruction.com/?post_type=projects&p=1683 Conversion of a former Army barracks building into a 42 room hotel on the Main Post of the Presidio in San Francisco. The scope of the work includes seismic upgrade; masonry restoration; all new mechanical, electrical, plumbing, and fire sprinkler systems; exterior site work and utilities; and interior finishes.

]]>
Presidio Theatre https://www.plantconstruction.com/projects/presidotheatre/ Tue, 26 Dec 2017 23:42:24 +0000 http://www.plantconstruction.com/?post_type=projects&p=1681 Rehabilitate of the Presidio Theatre with a seismic retrofit, underpinning and excavation to create new below grade dressing rooms and new lobby, courtyard and green room.

]]>
City Center Bishop Ranch https://www.plantconstruction.com/projects/city-center-bishop-ranch/ Tue, 26 Dec 2017 23:38:19 +0000 http://www.plantconstruction.com/?post_type=projects&p=1674 City Center Bishop Ranch is a 300,000-square-foot shopping, dining and entertainment experience, opening fall 2018 in San Ramon. Designed by renowned architect Renzo Piano Building Workshop, City Center will feature THE LOT, a 42,000-square-foot luxury cinema, an array of fashion and lifestyle retailers as well as sit-down and casual dining options. The 14.5-acre site will include a three-level parking deck, surface and valet parking, landscaping, pedestrian pathways and a one acre open-air Piazza with water features, seating, event/entertainment staging and other amenities designed to provide a place where the community can gather and connect. The project is seeking LEED Gold.
For more information visit: citycenterbishopranch.com

]]>
Emeryville Public Market https://www.plantconstruction.com/projects/emeryville-public-market/ Tue, 26 Dec 2017 22:33:29 +0000 http://www.plantconstruction.com/?post_type=projects&p=1656 Plant is performing a four and a half year long complete redevelopment of a 10 acre industrial site located in Emeryville, CA. The area once housed the large Pabco Manufacturing Plant, making roofing and fiberboard products and various paint facilities. The work consists of construction of two new approx. 145,000sf post tensioned concrete parking structures built over ground floor retail space, a steel structured restaurant building and ten blocks of completely new utility infrastructure and streetscape and a new 1.25 acre park and playground. The project is located in a very heavily trafficked part of Emeryville and directly adjacent to residential apartment blocks, a flourishing food court and operating businesses. To perform the infrastructure and street work we constructed a temporary bypass-road to reroute traffic around the site. The work also involves tight coordination with other general contractors on site, one performing the work of a residential apartment building in Parcel A to the north and the other building out the grocery store on the ground floor of our first parking structure. The first parking structure and the first phase of the streets will be completed in the 3rd quarter of 2017. The remainder of the street Work will finish at the end of 2017. The second parking structure work and city park work will begin in the 4th quarter of 2017.

]]>