Interiors – Plant Construction Company, L.P. https://www.plantconstruction.com Sat, 22 Sep 2018 00:13:01 +0000 en-US hourly 1 https://wordpress.org/?v=4.9.8 447 Minna Street https://www.plantconstruction.com/projects/447-minna-street/ Thu, 04 Jan 2018 21:15:25 +0000 http://www.plantconstruction.com/?post_type=projects&p=1735 Plant removed and replaced the wood framed roof of a 100 year old, four-story brick and heavy timber building owned by the Hearst Corporation. The project includes upgrading the diaphragm with shear ply, new membrane roofing system, rebuilding and restoring the masonry walls, new elevator system, and interior demolition and shoring.

]]>
Callisto Media https://www.plantconstruction.com/projects/callisto-media/ Thu, 04 Jan 2018 17:17:25 +0000 http://www.plantconstruction.com/?post_type=projects&p=1712 An existing brick and timber building space that was previously used as a gym. Plant converted the space into a 17,000 sf office space for Callisto Media, with new restrooms, kitchen, break area, individual offices and phone rooms. The scope included design-build mechanical, electrical, plumbing and fire.

]]>
Meals on Wheels of SF https://www.plantconstruction.com/projects/meals-on-wheels-of-sf/ Thu, 04 Jan 2018 16:44:08 +0000 http://www.plantconstruction.com/?post_type=projects&p=1726 Plant is about to begin preconstruction on a new facility for Meals on Wheels of SF. Meals on Wheels, now delivering over 1.6 million meals per year, has outgrown their existing facility on Fairfax Avenue, a few blocks from Plant HQ, and has purchased a piece of property on Jerrold Street, also just a few blocks away. The new 60,000 square foot facility on 2 levels, will contain a new commercial high production kitchen, cold storage, warehouse, loading dock, logistics and office space. Challenges on the project will be the bay mud soil underlying the site, establishing workable easements with neighbors and the construction of the complicated and extensive kitchen. Upon completion of the new building, we will begin the renovation of the 20,000 square foot existing facility on Fairfax ave, which will include interiors work, new elevators and stairways and other improvements. The new building is expected to be a 13 month project, with the existing building being completed 7 months later. Meals on Wheels is an amazing organization, providing a much needed service to our community, and we are excited to be associated with such a good cause.

]]>
2150 Webster Street https://www.plantconstruction.com/projects/2150-webster-street/ Thu, 04 Jan 2018 00:34:20 +0000 http://www.plantconstruction.com/?post_type=projects&p=1723 Core and shell improvements to an existing 10-story, 250,000 sf office building in Oakland. The project includes new windows, renovated storefront, five new elevators, new penthouse structure, roofing, fire sprinkler system upgrades, plumbing and HVAC systems, new electrical wiring and a new steel deck.

]]>
Blend Labs at 500 Pine Street https://www.plantconstruction.com/projects/500-pine-street/ Wed, 27 Dec 2017 00:40:29 +0000 http://www.plantconstruction.com/?post_type=projects&p=1706 Plant was selected by the joint venture developer team of Lincoln Property Company/Gemdale USA Corporation to complete a tenant improvement project for Blend Labs, located on floors 2-5 at the newly constructed office building at 500 Pine Street. O+A Architects has designed the Blend Labs office as a combination of open spaces, conference, focus, phone and game rooms. The truly common spaces include coffee bars on each floor, as well as reception. The focal point on floors three and four is the combined architectural stair / stadium seating connecting the two floors. The project team was tasked with shoring the adjacent slab and creating a new opening in the existing post tensioned slab, for the new stair.

]]>
Swirl Headquarters https://www.plantconstruction.com/projects/swirl-headquarters/ Wed, 27 Dec 2017 00:09:45 +0000 http://www.plantconstruction.com/?post_type=projects&p=1509 Tenant improvements to multiple floors of historical Building 101 to house the marketing agency Swirl. Improvements included build out of MEPF systems and modifications to the base building central plant to allow for multiple tenant energy efficiencies. Special care was taken to remove as little of the existing historic fabric as possible while complementing the spaces with open floor plans and environmentally conscious finish materials. The project received LEED Gold certification.

]]>
Blue Bottle Coffee – Venice Beach https://www.plantconstruction.com/projects/blue-bottle-coffee-venice-beach/ Wed, 27 Dec 2017 00:08:04 +0000 http://www.plantconstruction.com/?post_type=projects&p=1366 Tenant improvement work to build out a new location for Blue Bottle Coffee in Southern California.

]]>
Hilton Union Square Hotel – Lobby Renovation https://www.plantconstruction.com/projects/hilton-union-square-hotel-lobby-renovation/ Wed, 27 Dec 2017 00:06:52 +0000 http://www.plantconstruction.com/?post_type=projects&p=1488 While remaining fully operational during construction, the extensive renovation of 19,100 square feet of the union labor hotel’s lobby and food and beverage areas included a new front desk configuration and the addition of a Bar in the lobby. New stone flooring in specific locations, updated wall and ceiling finishes, new lighting, paint and wall covering and new FF&E bring the hotel’s greeting space up to functional and code requirements. The addition of a new Bar and Back Bar in the lobby accommodated 12-14 bar seats included new MEP and Cat 6 drops. Upgrading and reconfiguration of Urban Tavern restaurant, reconfiguration of existing Starbucks location into the new Herb N’Kitchen. Refresh of Public Restrooms Corridor, code upgrades in Lobby, Grab & Go, and Urban Tavern.

]]>
22 Fourth Street Lobby https://www.plantconstruction.com/projects/22-fourth-street-lobby/ Wed, 27 Dec 2017 00:05:19 +0000 http://www.plantconstruction.com/?post_type=projects&p=1518 Renovation of large main building lobby in a high-rise office building. Work included full storefront replacement; construction of new indoor-outdoor green-wall; custom water feature with digital back-projection graphics; new terrazzo flooring throughout; cafe/coffee-bar space with food service equipment and fixed seating; custom back-lit glass wall surrounding elevator entrances; clear finished plate-steel portals and trim elements; all new lighting including custom/artistic ceiling pendants; and new finishes at the rear access corridor to the loading dock. All work was completed while building remained occupied and lobby functionality was maintained.

]]>
Blue Bottle Coffee – Ferry Building https://www.plantconstruction.com/projects/blue-bottle-coffee-ferry-building/ Wed, 27 Dec 2017 00:03:19 +0000 http://www.plantconstruction.com/?post_type=projects&p=1353 Coffee shop renovation utilizing custom high-end cantilevered counter casework, cabinetry and new service desk window location.

]]>